{"id":10673,"date":"2017-11-09T07:30:28","date_gmt":"2017-11-09T07:30:28","guid":{"rendered":"https:\/\/blog.zuken.com\/?p=9268"},"modified":"2025-02-21T10:43:31","modified_gmt":"2025-02-21T10:43:31","slug":"pantec-automation","status":"publish","type":"post","link":"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/","title":{"rendered":"Pantec Automation Cuts Manufacturing Time by Almost Half Using E3.series"},"content":{"rendered":"<p>The only thing I like more than a good win-win situation is when there\u2019s a win-win-win. That was the conclusion I drew when I discovered how Pantec Automation, which designs and manufactures control systems for machines, <a href=\"https:\/\/www.zuken.com\/en\/company\/customers\/pantec-automation\">used E3.series to almost halve its manufacturing times<\/a>. And they can now send 95% of work to their shop floor without design engineering intervention. The company is also helping its customers be more competitive. Here&#8217;s a breakdown of their before and after figures:<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-9296 \" src=\"https:\/\/blog.zuken.com\/wp-content\/uploads\/2018\/10\/Pantec-time-savings-3.jpg\" alt=\"\" width=\"680\" height=\"278\" \/><\/p>\n<p>Now I&#8217;ll talk you through how they achieved this&#8230;<\/p>\n<h3>Under threat<\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-9270 alignright\" src=\"https:\/\/blog.zuken.com\/wp-content\/uploads\/2017\/10\/panteci-rhino-II-300x244.jpg\" alt=\"Pantec RHINO II\" width=\"300\" height=\"244\" \/>Pantec Automation, a business unit of Pantec Engineering AG, had a problem; or rather its customers did. They are OEMs of highly automated machines used in industries such as food processing, pharmaceuticals, in textile and paper mills and on automated assembly lines. Recently, their markets started being served by lower-cost, lower quality foreign imports. So, to support its customers, Pantec set about finding ways in which it could reduce costs and help the machine builders engage more efficiently with their customers.<\/p>\n<h3>An odd custom<\/h3>\n<p>The machine builds are mostly unique, as specifications such as physical dimensions, roller speeds and the number of encoders or other sensors will be set to meet the requirements of a particular plant or factory. Not surprisingly, the development and build of a machine for a plant was a design intensive and time-consuming task. For instance when liaising with a customer, the machine builder\u2019s salespeople needed to understand the customer\u2019s requirements. Their engineers would get heavily involved, because they knew what was required to meet the requirements. They also knew which parts of a machine would work with others. Pantec would then quote for the supply of control cabinets, HMIs and cabling; all before the machine builder could get to their customer. Then there was the build time, and the project turnaround time (from machine order to commissioning) was about 15 weeks.<\/p>\n<h3>Got to be a better way<\/h3>\n<p><strong>The key questions were:<\/strong><\/p>\n<ul>\n<li>How could the machine builder\u2019s sales people be better supported, whilst simultaneously reducing their design engineers\u2019 time?<\/li>\n<li>How could Pantec shorten the time to produce cabinets, HMIs and cables, and so reduce costs?<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-9271 alignright\" src=\"https:\/\/blog.zuken.com\/wp-content\/uploads\/2017\/10\/pantec-assembly-300x200.jpg\" alt=\"Pantec assembly\" width=\"300\" height=\"200\" \/>It was recognised early on that Zuken\u2019s E3.series, which Pantec had been using solely for electrical schematics and cable drawings, could play a far greater role in making its processes more efficient, because of the its ability to manage options and variants. Through tighter integration within Pantec Automation\u2019s IT system, E3.series began playing a crucial role within a \u2018Configurator\u2019 tool the company built for its customers (the machine builders) to use when talking to their customers.<\/p>\n<p>The Configurator presents a list of valid variants and options, controlled by a logical \u2018decision tree\u2019, which makes for a very efficient selection process. Its Configurator then outputs a set of unique order numbers for the machine being specified, which ties in with Electrical Planning (i.e. electrical schematics and BOMs within E3.series) and Pantec Automation\u2019s ERP \/PPS system (for parts lists and sales orders etc.). There will typically be some bespoke work required but from Pantec Automation\u2019s perspective, 95% of the work needed to meet the customer\u2019s unique overall requirements can go straight to the company\u2019s experienced assembly personnel with little or no design engineering intervention; because it is all policed by the Configurator.<\/p>\n<h3>Time will tell<\/h3>\n<p>Project turnaround (from machine order to onsite commissioning) used to take around 15 weeks:<\/p>\n<p>1 week for electrical planning, 8 weeks for sourcing, 5 weeks for assembly and 1 week for testing. Now, with E3.series, project turnaround is about 8 weeks: 0 weeks for electrical planning (it\u2019s not needed), 4 weeks for sourcing (improved stock management due to the availability of pre-assembled modules), 3 weeks for assembly (clearer assembly documentation, so fewer calls to engineering are needed) and 1 week for testing.<\/p>\n<p>This reduction from 15 to 8 weeks for all activities between machine order and commissioning equates to almost 50%.<\/p>\n<hr \/>\n<h4><a href=\"https:\/\/www.zuken.com\/en\/company\/customers\/pantec-automation\">Read the full story<\/a><\/h4>\n","protected":false},"excerpt":{"rendered":"<p>\t\t\t\tThe only thing I like more than a good win-win situation is when there\u2019s a win-win-win. That was the conclusion I drew when I discovered how Pantec Automation, which designs and manufactures control systems for machines, used E3.series to almost halve its manufacturing times. \t\t<\/p>\n","protected":false},"author":37,"featured_media":11255,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"om_disable_all_campaigns":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[223],"tags":[284,296,20135],"class_list":["post-10673","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrical-fluid-design","tag-manufacturing","tag-options-and-variants","tag-people-market"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.8 (Yoast SEO v24.8.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Pantec Cuts Manufacturing Time by Almost Half with E3.series - Zuken Blog<\/title>\n<meta name=\"description\" content=\"The only thing I like more than a good win-win situation is when there\u2019s a win-win-win. That was the conclusion I drew when I discovered how Pantec Automation, which designs and manufactures control systems for machines, used E3.series to almost halve its manufacturing times.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pantec Automation Cuts Manufacturing Time by Almost Half Using E3.series\" \/>\n<meta property=\"og:description\" content=\"The only thing I like more than a good win-win situation is when there\u2019s a win-win-win. That was the conclusion I drew when I discovered how Pantec Automation, which designs and manufactures control systems for machines, used E3.series to almost halve its manufacturing times.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/\" \/>\n<meta property=\"og:site_name\" content=\"English\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/zukenglobal\/\" \/>\n<meta property=\"article:published_time\" content=\"2017-11-09T07:30:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-02-21T10:43:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/04\/pantec-automation-featured-img.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t<meta property=\"og:image:height\" content=\"727\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ulrich Prottung\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@zukeneurope\" \/>\n<meta name=\"twitter:site\" content=\"@zukeneurope\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ulrich Prottung\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/\"},\"author\":{\"name\":\"Ulrich Prottung\",\"@id\":\"https:\/\/www.zuken.com\/en\/#\/schema\/person\/16b3c0e360882de5c2bfba9c388f61c7\"},\"headline\":\"Pantec Automation Cuts Manufacturing Time by Almost Half Using E3.series\",\"datePublished\":\"2017-11-09T07:30:28+00:00\",\"dateModified\":\"2025-02-21T10:43:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/\"},\"wordCount\":671,\"publisher\":{\"@id\":\"https:\/\/www.zuken.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/04\/pantec-automation-featured-img.jpg\",\"keywords\":[\"Manufacturing Design Technology\",\"Options and Variants\",\"People &amp; Market\"],\"articleSection\":[\"Electrical \/ Fluid Design\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/\",\"url\":\"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/\",\"name\":\"Pantec Cuts Manufacturing Time by Almost Half with E3.series - Zuken Blog\",\"isPartOf\":{\"@id\":\"https:\/\/www.zuken.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/04\/pantec-automation-featured-img.jpg\",\"datePublished\":\"2017-11-09T07:30:28+00:00\",\"dateModified\":\"2025-02-21T10:43:31+00:00\",\"description\":\"The only thing I like more than a good win-win situation is when there\u2019s a win-win-win. That was the conclusion I drew when I discovered how Pantec Automation, which designs and manufactures control systems for machines, used E3.series to almost halve its manufacturing times.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/#primaryimage\",\"url\":\"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/04\/pantec-automation-featured-img.jpg\",\"contentUrl\":\"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/04\/pantec-automation-featured-img.jpg\",\"width\":1500,\"height\":727,\"caption\":\"Pantec Automation Cuts Manufacturing Time by Almost Half Using E3.series\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.zuken.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pantec Automation Cuts Manufacturing Time by Almost Half Using E3.series\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.zuken.com\/en\/#website\",\"url\":\"https:\/\/www.zuken.com\/en\/\",\"name\":\"English\",\"description\":\"PCB Design, Electrical Design, &amp; Design Data Management\",\"publisher\":{\"@id\":\"https:\/\/www.zuken.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.zuken.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.zuken.com\/en\/#organization\",\"name\":\"Zuken\",\"url\":\"https:\/\/www.zuken.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.zuken.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/03\/zuken-flag-R-150px.png\",\"contentUrl\":\"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/03\/zuken-flag-R-150px.png\",\"width\":150,\"height\":139,\"caption\":\"Zuken\"},\"image\":{\"@id\":\"https:\/\/www.zuken.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/zukenglobal\/\",\"https:\/\/x.com\/zukeneurope\",\"https:\/\/www.instagram.com\/zukenglobal\/\",\"https:\/\/www.linkedin.com\/company\/zuken\",\"https:\/\/www.youtube.com\/channel\/UCSvO_Owt3yUMi0PVUqkIO3w\",\"https:\/\/en.wikipedia.org\/wiki\/Zuken\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.zuken.com\/en\/#\/schema\/person\/16b3c0e360882de5c2bfba9c388f61c7\",\"name\":\"Ulrich Prottung\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.zuken.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/09d70e7ace5e7ecf68df9a5df2bee253?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/09d70e7ace5e7ecf68df9a5df2bee253?s=96&d=mm&r=g\",\"caption\":\"Ulrich Prottung\"},\"description\":\"Dipl. Inf. Wiss. Ulrich Prottung, E3.series Product Manager, studied Information Science at the University of Konstanz. He has worked for over 25 years in the electrical CAD business, having worked in many different roles, amongst others as General Customer Support Manager. Some years he taught at the University of Applied Sciences Ulm.\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Pantec Cuts Manufacturing Time by Almost Half with E3.series - Zuken Blog","description":"The only thing I like more than a good win-win situation is when there\u2019s a win-win-win. That was the conclusion I drew when I discovered how Pantec Automation, which designs and manufactures control systems for machines, used E3.series to almost halve its manufacturing times.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/","og_locale":"en_GB","og_type":"article","og_title":"Pantec Automation Cuts Manufacturing Time by Almost Half Using E3.series","og_description":"The only thing I like more than a good win-win situation is when there\u2019s a win-win-win. That was the conclusion I drew when I discovered how Pantec Automation, which designs and manufactures control systems for machines, used E3.series to almost halve its manufacturing times.","og_url":"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/","og_site_name":"English","article_publisher":"https:\/\/www.facebook.com\/zukenglobal\/","article_published_time":"2017-11-09T07:30:28+00:00","article_modified_time":"2025-02-21T10:43:31+00:00","og_image":[{"width":1500,"height":727,"url":"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/04\/pantec-automation-featured-img.jpg","type":"image\/jpeg"}],"author":"Ulrich Prottung","twitter_card":"summary_large_image","twitter_creator":"@zukeneurope","twitter_site":"@zukeneurope","twitter_misc":{"Written by":"Ulrich Prottung","Estimated reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/#article","isPartOf":{"@id":"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/"},"author":{"name":"Ulrich Prottung","@id":"https:\/\/www.zuken.com\/en\/#\/schema\/person\/16b3c0e360882de5c2bfba9c388f61c7"},"headline":"Pantec Automation Cuts Manufacturing Time by Almost Half Using E3.series","datePublished":"2017-11-09T07:30:28+00:00","dateModified":"2025-02-21T10:43:31+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/"},"wordCount":671,"publisher":{"@id":"https:\/\/www.zuken.com\/en\/#organization"},"image":{"@id":"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/04\/pantec-automation-featured-img.jpg","keywords":["Manufacturing Design Technology","Options and Variants","People &amp; Market"],"articleSection":["Electrical \/ Fluid Design"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/","url":"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/","name":"Pantec Cuts Manufacturing Time by Almost Half with E3.series - Zuken Blog","isPartOf":{"@id":"https:\/\/www.zuken.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/#primaryimage"},"image":{"@id":"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/04\/pantec-automation-featured-img.jpg","datePublished":"2017-11-09T07:30:28+00:00","dateModified":"2025-02-21T10:43:31+00:00","description":"The only thing I like more than a good win-win situation is when there\u2019s a win-win-win. That was the conclusion I drew when I discovered how Pantec Automation, which designs and manufactures control systems for machines, used E3.series to almost halve its manufacturing times.","breadcrumb":{"@id":"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/#primaryimage","url":"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/04\/pantec-automation-featured-img.jpg","contentUrl":"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/04\/pantec-automation-featured-img.jpg","width":1500,"height":727,"caption":"Pantec Automation Cuts Manufacturing Time by Almost Half Using E3.series"},{"@type":"BreadcrumbList","@id":"https:\/\/www.zuken.com\/en\/blog\/pantec-automation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zuken.com\/en\/"},{"@type":"ListItem","position":2,"name":"Pantec Automation Cuts Manufacturing Time by Almost Half Using E3.series"}]},{"@type":"WebSite","@id":"https:\/\/www.zuken.com\/en\/#website","url":"https:\/\/www.zuken.com\/en\/","name":"English","description":"PCB Design, Electrical Design, &amp; Design Data Management","publisher":{"@id":"https:\/\/www.zuken.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zuken.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.zuken.com\/en\/#organization","name":"Zuken","url":"https:\/\/www.zuken.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.zuken.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/03\/zuken-flag-R-150px.png","contentUrl":"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/03\/zuken-flag-R-150px.png","width":150,"height":139,"caption":"Zuken"},"image":{"@id":"https:\/\/www.zuken.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/zukenglobal\/","https:\/\/x.com\/zukeneurope","https:\/\/www.instagram.com\/zukenglobal\/","https:\/\/www.linkedin.com\/company\/zuken","https:\/\/www.youtube.com\/channel\/UCSvO_Owt3yUMi0PVUqkIO3w","https:\/\/en.wikipedia.org\/wiki\/Zuken"]},{"@type":"Person","@id":"https:\/\/www.zuken.com\/en\/#\/schema\/person\/16b3c0e360882de5c2bfba9c388f61c7","name":"Ulrich Prottung","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.zuken.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/09d70e7ace5e7ecf68df9a5df2bee253?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/09d70e7ace5e7ecf68df9a5df2bee253?s=96&d=mm&r=g","caption":"Ulrich Prottung"},"description":"Dipl. Inf. Wiss. Ulrich Prottung, E3.series Product Manager, studied Information Science at the University of Konstanz. He has worked for over 25 years in the electrical CAD business, having worked in many different roles, amongst others as General Customer Support Manager. Some years he taught at the University of Applied Sciences Ulm."}]}},"_links":{"self":[{"href":"https:\/\/www.zuken.com\/en\/wp-json\/wp\/v2\/posts\/10673","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zuken.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zuken.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zuken.com\/en\/wp-json\/wp\/v2\/users\/37"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zuken.com\/en\/wp-json\/wp\/v2\/comments?post=10673"}],"version-history":[{"count":0,"href":"https:\/\/www.zuken.com\/en\/wp-json\/wp\/v2\/posts\/10673\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zuken.com\/en\/wp-json\/wp\/v2\/media\/11255"}],"wp:attachment":[{"href":"https:\/\/www.zuken.com\/en\/wp-json\/wp\/v2\/media?parent=10673"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zuken.com\/en\/wp-json\/wp\/v2\/categories?post=10673"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zuken.com\/en\/wp-json\/wp\/v2\/tags?post=10673"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}