{"id":10648,"date":"2017-06-06T07:03:14","date_gmt":"2017-06-06T07:03:14","guid":{"rendered":"http:\/\/zukenblog.wpengine.com\/?p=9022"},"modified":"2023-05-12T10:42:14","modified_gmt":"2023-05-12T09:42:14","slug":"design-time-vs-admin-overheads-win-war-closing-gaps","status":"publish","type":"post","link":"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/","title":{"rendered":"Design Time vs. Admin Overheads: How to Win the Battle by Closing the Gaps"},"content":{"rendered":"<p>No more distractions, please! 45% of our time is already spent on admin. If you\u2019re the average engineer, that is.<\/p>\n<p>Techconsult, a German-based analyst firm has just found that almost half of the engineering time of any manufacturing company is spent feeding systems and re-entering data. So it\u2019s no surprise that economists are scratching their heads trying to explain why productivity is declining, despite constantly increasing investments in IT systems.<\/p>\n<h3>Complexity stunts productivity<\/h3>\n<p>We asked Techconsult to look into this, so they spoke to more than 150 engineering managers to find out where the problem lies. The answer: The complexity of products and processes is increasing, putting engineering productivity under pressure. Design re06use seems to be a viable solution, but the managers doubt that the available systems will help them.<\/p>\n<p>This is bad news \u2013 but it gets worse. In the information age, the common cure for any problem is to throw a piece of software at it. In the case of engineering, the consensus was: Map the product development process in a system, manage the design data, and this will solve the issue. But the survey data doesn\u2019t bear this out, finding that 77% of engineering decision-makers expect to gain no positive productivity effects from a PLM system.<\/p>\n<p>Admittedly, I\u2019m not surprised by this outcome (though I was expecting a little more positivity). But it is completely in line with my day-to-day customer experience. From the Zuken perspective, it has always been an issue that the workflows and requirements of electrical and electronics engineering were not covered by PLM systems, opening a dangerous gap where there should be a seamless cross-discipline flow of design data and process information.<\/p>\n<h3>The good news<\/h3>\n<p>So, is there any good news here? There is, and it comes in a clear statement from the engineering managers surveyed by Techconsult: 78% believe there is value in dedicated design data management for electrical and electronics engineering, tightly integrated with a PLM system (and equally tightly integrated into the ECAD system, I would add). This is what we call domain data management at Zuken. It\u2019s just a fancy term for electrical and electronics engineers managing their own data and workflow from within their own tools. It&#8217;s something we\u2019ve been doing for electronics engineers for a long time, but now we\u2019re making it truly cross-discipline by adding a dedicated tool for electrical engineers, with <a href=\"https:\/\/www.zuken.com\/en\/products\/engineering-data-management\/ds-e3\">DS-E3<\/a>.<\/p>\n<p>We knew the need was there, and we had an idea that companies were beginning to understand where the gaps lay in their systems, but as Robert Heinlein said: &#8220;Being right too soon is socially unacceptable.&#8221; I guess the time for domain data management has come. Finally.<\/p>\n<p><strong>Find out more at <a href=\"https:\/\/www.zuken.com\/edm\">www.zuken.com\/edm<\/a>\u00a0or watch our new movie<\/strong><\/p>\n<p><iframe loading=\"lazy\" title=\"Zuken Engineering Data Management - fresh thinking...\" width=\"798\" height=\"449\" src=\"https:\/\/www.youtube.com\/embed\/Ghs9j4N2blQ?start=7&#038;feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" allowfullscreen><\/iframe><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\t\t\t\tTechconsult, a German-based analyst firm has just found that almost half of the engineering time of any manufacturing company is spent feeding systems and re-entering data. So it\u2019s no surprise that economists are scratching their heads trying to explain why productivity is declining, despite constantly increasing investments in IT systems.\t\t<\/p>\n","protected":false},"author":58,"featured_media":11231,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"om_disable_all_campaigns":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[223,228],"tags":[336,20136,270,316,14676,307],"class_list":["post-10648","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrical-fluid-design","category-pcb-design","tag-data-management","tag-ds-2","tag-ds-cr","tag-ds-e3","tag-electrical","tag-product-development"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.8 (Yoast SEO v24.8.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Design Time vs. Admin Overhead: Closing the Gaps - Zuken Blog<\/title>\n<meta name=\"description\" content=\"No more distractions, please! 45% of our time is already spent on admin. If you\u2019re the average engineer, that is.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Design Time vs. Admin Overheads: How to Win the Battle by Closing the Gaps\" \/>\n<meta property=\"og:description\" content=\"No more distractions, please! 45% of our time is already spent on admin. If you\u2019re the average engineer, that is.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/\" \/>\n<meta property=\"og:site_name\" content=\"English\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/zukenglobal\/\" \/>\n<meta property=\"article:published_time\" content=\"2017-06-06T07:03:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-05-12T09:42:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/04\/ds-e3-featured-img.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t<meta property=\"og:image:height\" content=\"727\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Thomas Gessner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@zukeneurope\" \/>\n<meta name=\"twitter:site\" content=\"@zukeneurope\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Thomas Gessner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/\"},\"author\":{\"name\":\"Thomas Gessner\",\"@id\":\"https:\/\/www.zuken.com\/en\/#\/schema\/person\/67ae3d9ef0cad1c03fbb313be0068f30\"},\"headline\":\"Design Time vs. Admin Overheads: How to Win the Battle by Closing the Gaps\",\"datePublished\":\"2017-06-06T07:03:14+00:00\",\"dateModified\":\"2023-05-12T09:42:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/\"},\"wordCount\":491,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.zuken.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/04\/ds-e3-featured-img.jpg\",\"keywords\":[\"Data Management\",\"DS-2\",\"DS-CR\",\"DS-E3\",\"Electrical\",\"Product Development\"],\"articleSection\":[\"Electrical \/ Fluid Design\",\"PCB Design\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/\",\"url\":\"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/\",\"name\":\"Design Time vs. Admin Overhead: Closing the Gaps - Zuken Blog\",\"isPartOf\":{\"@id\":\"https:\/\/www.zuken.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/04\/ds-e3-featured-img.jpg\",\"datePublished\":\"2017-06-06T07:03:14+00:00\",\"dateModified\":\"2023-05-12T09:42:14+00:00\",\"description\":\"No more distractions, please! 45% of our time is already spent on admin. If you\u2019re the average engineer, that is.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/#primaryimage\",\"url\":\"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/04\/ds-e3-featured-img.jpg\",\"contentUrl\":\"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/04\/ds-e3-featured-img.jpg\",\"width\":1500,\"height\":727,\"caption\":\"Design Time vs. Admin Overheads: How to Win the Battle by Closing the Gaps\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.zuken.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Design Time vs. Admin Overheads: How to Win the Battle by Closing the Gaps\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.zuken.com\/en\/#website\",\"url\":\"https:\/\/www.zuken.com\/en\/\",\"name\":\"English\",\"description\":\"PCB Design, Electrical Design, &amp; Design Data Management\",\"publisher\":{\"@id\":\"https:\/\/www.zuken.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.zuken.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.zuken.com\/en\/#organization\",\"name\":\"Zuken\",\"url\":\"https:\/\/www.zuken.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.zuken.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/03\/zuken-flag-R-150px.png\",\"contentUrl\":\"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/03\/zuken-flag-R-150px.png\",\"width\":150,\"height\":139,\"caption\":\"Zuken\"},\"image\":{\"@id\":\"https:\/\/www.zuken.com\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/zukenglobal\/\",\"https:\/\/x.com\/zukeneurope\",\"https:\/\/www.instagram.com\/zukenglobal\/\",\"https:\/\/www.linkedin.com\/company\/zuken\",\"https:\/\/www.youtube.com\/channel\/UCSvO_Owt3yUMi0PVUqkIO3w\",\"https:\/\/en.wikipedia.org\/wiki\/Zuken\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.zuken.com\/en\/#\/schema\/person\/67ae3d9ef0cad1c03fbb313be0068f30\",\"name\":\"Thomas Gessner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.zuken.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1f033b11a386ef94d89d39492784f7ce?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1f033b11a386ef94d89d39492784f7ce?s=96&d=mm&r=g\",\"caption\":\"Thomas Gessner\"},\"description\":\"Thomas Gessner is responsible for the business development of Zuken's MBSE solutions. Together with solution partners and technical experts, he helps build solutions that enable customers to achieve product success. His experience spans 35 years in product development software and methods.\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Design Time vs. Admin Overhead: Closing the Gaps - Zuken Blog","description":"No more distractions, please! 45% of our time is already spent on admin. If you\u2019re the average engineer, that is.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/","og_locale":"en_GB","og_type":"article","og_title":"Design Time vs. Admin Overheads: How to Win the Battle by Closing the Gaps","og_description":"No more distractions, please! 45% of our time is already spent on admin. If you\u2019re the average engineer, that is.","og_url":"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/","og_site_name":"English","article_publisher":"https:\/\/www.facebook.com\/zukenglobal\/","article_published_time":"2017-06-06T07:03:14+00:00","article_modified_time":"2023-05-12T09:42:14+00:00","og_image":[{"width":1500,"height":727,"url":"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/04\/ds-e3-featured-img.jpg","type":"image\/jpeg"}],"author":"Thomas Gessner","twitter_card":"summary_large_image","twitter_creator":"@zukeneurope","twitter_site":"@zukeneurope","twitter_misc":{"Written by":"Thomas Gessner","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/#article","isPartOf":{"@id":"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/"},"author":{"name":"Thomas Gessner","@id":"https:\/\/www.zuken.com\/en\/#\/schema\/person\/67ae3d9ef0cad1c03fbb313be0068f30"},"headline":"Design Time vs. Admin Overheads: How to Win the Battle by Closing the Gaps","datePublished":"2017-06-06T07:03:14+00:00","dateModified":"2023-05-12T09:42:14+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/"},"wordCount":491,"commentCount":0,"publisher":{"@id":"https:\/\/www.zuken.com\/en\/#organization"},"image":{"@id":"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/#primaryimage"},"thumbnailUrl":"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/04\/ds-e3-featured-img.jpg","keywords":["Data Management","DS-2","DS-CR","DS-E3","Electrical","Product Development"],"articleSection":["Electrical \/ Fluid Design","PCB Design"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/","url":"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/","name":"Design Time vs. Admin Overhead: Closing the Gaps - Zuken Blog","isPartOf":{"@id":"https:\/\/www.zuken.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/#primaryimage"},"image":{"@id":"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/#primaryimage"},"thumbnailUrl":"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/04\/ds-e3-featured-img.jpg","datePublished":"2017-06-06T07:03:14+00:00","dateModified":"2023-05-12T09:42:14+00:00","description":"No more distractions, please! 45% of our time is already spent on admin. If you\u2019re the average engineer, that is.","breadcrumb":{"@id":"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/#primaryimage","url":"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/04\/ds-e3-featured-img.jpg","contentUrl":"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/04\/ds-e3-featured-img.jpg","width":1500,"height":727,"caption":"Design Time vs. Admin Overheads: How to Win the Battle by Closing the Gaps"},{"@type":"BreadcrumbList","@id":"https:\/\/www.zuken.com\/en\/blog\/design-time-vs-admin-overheads-win-war-closing-gaps\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zuken.com\/en\/"},{"@type":"ListItem","position":2,"name":"Design Time vs. Admin Overheads: How to Win the Battle by Closing the Gaps"}]},{"@type":"WebSite","@id":"https:\/\/www.zuken.com\/en\/#website","url":"https:\/\/www.zuken.com\/en\/","name":"English","description":"PCB Design, Electrical Design, &amp; Design Data Management","publisher":{"@id":"https:\/\/www.zuken.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zuken.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.zuken.com\/en\/#organization","name":"Zuken","url":"https:\/\/www.zuken.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.zuken.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/03\/zuken-flag-R-150px.png","contentUrl":"https:\/\/www.zuken.com\/en\/wp-content\/uploads\/sites\/2\/2019\/03\/zuken-flag-R-150px.png","width":150,"height":139,"caption":"Zuken"},"image":{"@id":"https:\/\/www.zuken.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/zukenglobal\/","https:\/\/x.com\/zukeneurope","https:\/\/www.instagram.com\/zukenglobal\/","https:\/\/www.linkedin.com\/company\/zuken","https:\/\/www.youtube.com\/channel\/UCSvO_Owt3yUMi0PVUqkIO3w","https:\/\/en.wikipedia.org\/wiki\/Zuken"]},{"@type":"Person","@id":"https:\/\/www.zuken.com\/en\/#\/schema\/person\/67ae3d9ef0cad1c03fbb313be0068f30","name":"Thomas Gessner","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.zuken.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/1f033b11a386ef94d89d39492784f7ce?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1f033b11a386ef94d89d39492784f7ce?s=96&d=mm&r=g","caption":"Thomas Gessner"},"description":"Thomas Gessner is responsible for the business development of Zuken's MBSE solutions. Together with solution partners and technical experts, he helps build solutions that enable customers to achieve product success. His experience spans 35 years in product development software and methods."}]}},"_links":{"self":[{"href":"https:\/\/www.zuken.com\/en\/wp-json\/wp\/v2\/posts\/10648","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zuken.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zuken.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zuken.com\/en\/wp-json\/wp\/v2\/users\/58"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zuken.com\/en\/wp-json\/wp\/v2\/comments?post=10648"}],"version-history":[{"count":0,"href":"https:\/\/www.zuken.com\/en\/wp-json\/wp\/v2\/posts\/10648\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zuken.com\/en\/wp-json\/wp\/v2\/media\/11231"}],"wp:attachment":[{"href":"https:\/\/www.zuken.com\/en\/wp-json\/wp\/v2\/media?parent=10648"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zuken.com\/en\/wp-json\/wp\/v2\/categories?post=10648"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zuken.com\/en\/wp-json\/wp\/v2\/tags?post=10648"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}